Flatiron
Public
Denver, CO
$9,283,895
May 2020–October 2020
Aviation
This project involved the rehabilitation and reconstruction of Taxiways L and M abeam Runway 17R-35L and associated taxiway connectors between the taxiway and hold bar at Denver International Airport. Construction activities included the removal and replacement of deteriorated concrete slabs and concrete sealant on the taxiways. Additionally, surface painted pavement markings were refreshed and surface drainage and slope issues were resolved. Royal upgraded the airfield lighting system with new LED fixtures, transformers, cables, and guidance signs as well as reconstructing the ALSF Station.
Installations included: